Updated Renovation Progress
Now that I’ve more time, I decided to be very updated on my renovation progress in my blog.
My platform living room. The wall and floor is going to be carpeted. I know maintenance will be hassle, worry about that later. Nice now can le!


My kitchen after the walls are hacked.

To the left of the kitchen. That wall will be totally different when its done. Hard to explain now la but a picture says a thousand words. So watch that space ya! Heh..

The walkway to my bedrooms now. Having a headache about this area at the moment as its an area that is big not say big but say small not say small. Wanted to wallpaper that wall initially, hang a mirror and put a tall standing ornament at one corner but the ID say can’t do as not nice because the wallpaper won’t have 搜口. If no wallpaper, it will look kinda boring and plain lei. How how how?

I changed the toilet windows too. It was those lourve kind.


I prefer one piece type. Easier to clean also. Don’t know how much though, haven’t pay yet. :p


They did the first coat of painting on Wednesday. I love the black ceilings as it makes the ceiling look higher like a bottomless hole. Was telling Dar that with the white ceiling, it seems the top of his head can hit the ceiling but with black ceiling, there seems to be so much space in between. Need to discuss with ID again. Feel that the colour is still a bit too light. Prefer something more mocha. Playing with colours is fun!
Living room.


The kitchen after painting. It looks way neater in one colour than all the patches here and there before.


My bedroom.


Regan’s room before any renovation .

Box up the recess wall partially.

Ta dah!! After painting. Quite a bit of transformation right. Chose green for his room as its good for the eyes. Hee hee.. Was worried after I chose it though because I’ve seen awful green rooms but when I saw it, I think it looks happy. Its the only room in the house that has such a bright and cheery colour.

My sanitary was delivered that same day.

Toilet sink.

Kitchen sink.

Most important, my rainbath shower head! Er, still in the box, after they install, I take the picture again ok. Think they are doing the installation this weekend.

Its still super dusty and messy now. And I’m worried about them staining my new homogeneous tiles though it is covered with corrugated paper now and my ID say he will polished it before handover. But there are some parts where the corrugated paper is torn and the tiles are kinda very dirty.
I can’t wait for it to be finished. Can it be tomorrow?